Passive Fire Protection Guidance
Twelve questions every Responsible Person, building owner, facilities manager and procurement professional should ask before commissioning fire stopping or compartmentation works.

Choose a contractor that can demonstrate valid third-party certification, suitably qualified and assessed installers, experience with the type of building involved, access to applicable tested or assessed systems and robust quality assurance procedures.
Ask for the contractor's certification number and independently verify it with the third-party certification provider. Confirm that the certificate is current, belongs to the legal company being appointed and covers the exact fire stopping activity being commissioned.
The contractor should also explain whether each installation can be certified or whether it will need to be transparently recorded as a betterment. Where the project falls within the applicable higher-risk building regime in England or Wales, its records must support the building's Golden Thread of safety information.
Fire stopping is not simply the application of a fire-resistant product around a pipe, cable or opening. It is a specialist element of passive fire protection that helps maintain the intended fire resistance of compartment walls, floors, ceilings and other barriers.
Incorrect product selection, unsuitable supporting construction, undocumented deviations or poor workmanship can all undermine an installation. The completed work may appear satisfactory while sitting outside the scope of any tested or assessed system.
Building safety reforms in both England and Wales have increased the focus on competence, accountability and reliable building information. The detailed legal regimes are not identical, so the requirements for the country in which the building is located must be identified at the start of the project.
In England, the Building Safety Act 2022 and its supporting regulations create specific duties for higher-risk buildings and occupied high-rise residential buildings. In Wales, the Building Safety Act 2022 supports design-and-construction reforms, including the higher-risk building procedures that took effect on 1 July 2026, while the Building Safety (Wales) Act 2026 establishes a separate occupation-phase regime for multi-occupied residential buildings.
Selecting the right contractor is therefore important for life safety, property protection, regulatory compliance and the long-term management of the building.
Fire stopping protects openings, joints and service penetrations in fire-resisting construction. It is used where cables, pipes, ducts and other services pass through compartment walls and floors, or where construction interfaces could allow fire and smoke to spread.
Installations may use fire-resistant sealants, coated boards, batt systems, pipe collars, wraps, mortars or other products. The product itself, however, is only one part of the complete system.
The supporting wall or floor, service material, opening size, annular gap, insulation, fixings, seal depth and installation arrangement must all fall within the scope of the relevant tested or assessed detail.

Independent third-party certification provides an additional level of assurance because the contractor's management processes, technical controls, competence arrangements and installation work are subject to external assessment.
A certification logo displayed on a website, quotation, vehicle or uniform is not, by itself, sufficient evidence that the contractor currently holds the certification required for your project.
Request a copy of the contractor's current certificate and record its unique certificate or registration number. Verify that number through the certification provider's official directory or by contacting the provider directly.
Certificates can expire, scheme scopes can change and certification can be suspended or withdrawn. Check the current position with the issuing third-party certification provider before appointing the contractor.
Third-party certification is normally awarded for defined activities. Certification for one passive fire protection service does not automatically demonstrate certification for every other service a company offers.
For example, certification for fire door installation does not necessarily cover penetration seals, cavity barriers, fire-resistant ductwork or structural steel protection.
Ask the certification provider for clarification where the directory or certificate wording is unclear.
Fire stopping requires specialist knowledge as well as practical skill. Operatives should understand passive fire protection principles, tested systems, manufacturer instructions, supporting construction and the limits of their competence.
Evidence of competence may include a combination of:
A relevant fire stopping or passive fire protection NVQ, or an equivalent occupational qualification.
An appropriate CSCS or ECS-affiliated card for the person's role and occupation.
Familiarity with the tested or assessed details applicable to the proposed installations.
Current training relating to the products and systems the operative will install.
Evidence that workmanship and technical understanding have been assessed on site.
Refresher training, toolbox talks, supervision, Internal audits and continuing professional development. All inline with PAS8670.
Look for a combination of qualifications, knowledge, supervised experience, practical assessment and effective quality control.
England and Wales share important fire safety principles, but they do not have identical building safety regimes. A contractor working across both countries should be able to identify which legislation, procedures and approved guidance apply to the building and to the date on which the work is carried out.
The Regulatory Reform (Fire Safety) Order 2005 applies to non-domestic premises and the relevant parts of multi-occupied residential buildings in both England and Wales. It places duties on the Responsible Person, including the need to assess fire risk, put appropriate fire precautions in place and maintain relevant fire safety measures.
The Fire Safety Act 2021 clarified the application of the Fire Safety Order to the building's structure, external walls and flat entrance doors in buildings containing two or more sets of domestic premises. Section 156 of the Building Safety Act 2022 also strengthened information, recording and co-operation duties for Responsible Persons in both countries.
The Building Regulations 2010 operate in both England and Wales, but each country has its own amendments, approved documents and building control procedures. For fire safety work, the version of Approved Document B and the regulatory process applicable to the building's location must be used. Approval or completion documentation from one process should not be assumed to satisfy the other.
In England, the Building Safety Act 2022 and supporting regulations establish the higher-risk building regime. During design and construction, clients, principal designers and principal contractors must keep and hand over prescribed digital building information. During occupation, Accountable Persons and the Principal Accountable Person have information-management duties for in-scope high-rise residential buildings.
The information must remain accurate, secure, accessible and usable. The statutory record is commonly called the Golden Thread.
Wales has a separate higher-risk building control regime. From 1 July 2026, the Building (Higher-Risk Buildings Procedures) (Wales) Regulations 2025 require digital Golden Thread information for relevant higher-risk building work. The client and other dutyholders must manage the required information during the project, and the information must be handed to the Responsible Person when the work is completed.
For these Welsh design-and-construction rules, a higher-risk building is generally at least 18 metres high or at least seven storeys and contains at least one residential unit, a hospital, a care home or a children's home, subject to the detailed statutory definitions and exclusions.
The Building Safety (Wales) Act 2026 establishes Wales's separate occupation-phase regime for multi-occupied residential buildings. Its requirements are being implemented through further regulations and commencement arrangements, so clients and building owners should check which provisions are in force when work is planned or undertaken.
The Golden Thread is the accurate, accessible, secure and up-to-date information needed to understand a building, identify its building safety risks and explain how those risks are managed.
It should enable the right people to obtain the right information at the right time throughout design, construction, occupation, maintenance, refurbishment and future alterations.
Fire stopping is frequently concealed above ceilings, inside risers, beneath floors and within wall systems. Once covered, building managers may be unable to identify what was installed or determine whether later work has compromised it.
Reliable records should establish:
Agree the required digital format, asset references, drawing standards, naming conventions, photographic requirements and handover process before appointing the contractor.
Fire stopping records should be structured so they can be incorporated into the client's building information system, asset register or Golden Thread platform. Providing an unstructured folder of photographs at project completion may not create an effective or usable long-term record.
Statutory Golden Thread duties apply to defined buildings and work, not to every building. The scope and terminology differ between England and Wales. Equivalent structured records remain strong fire safety and asset-management practice even where the specific statutory Golden Thread provisions do not apply.
A fire compartmentation survey helps establish the condition of the building's compartment walls, floors, ceilings and associated passive fire protection.
Depending on its agreed scope, a survey may identify:
The survey scope, access limitations, inspection methodology, exclusions and reporting classifications should be agreed before the survey begins.
A product should not be selected solely because it carries a stated fire rating. The complete proposed arrangement must be supported by suitable evidence for the relevant wall or floor, opening and service configuration.
Before installation, the contractor should identify:
Combining unrelated products or modifying an installation without appropriate technical evidence may place the completed work outside the tested system's scope.
This distinction should be agreed and documented before work starts. Not every condition encountered in an existing building corresponds with an available tested or assessed fire stopping system.
Each installation's classification must be accurately reflected in the project records. Describing a betterment as certified work would create misleading building safety information and undermine the reliability of the Golden Thread.
A certifiable installation falls within the scope of suitable test or assessment evidence and is installed in accordance with the relevant detail and certification requirements.
A betterment may be considered where the existing condition does not fall within an available tested or assessed system and reconstruction is not immediately practicable.
It should not be described as achieving a specific period of fire resistance unless that performance is supported by suitable evidence.
Complex or non-standard situations may require input from the building's fire engineer, fire strategy author, principal designer, design team or another suitably competent specialist.
Suitable documentation supports future inspection, maintenance, refurbishment and building safety management. It should demonstrate what was installed, where it was installed, who completed it and the technical basis on which it was accepted.
For work within the relevant higher-risk building regime in England or Wales, agreed records may also form part of the statutory Golden Thread information maintained and handed over throughout the building's lifecycle.
Records should normally include:
Information should be accurate, legible, secure and capable of being updated when the building changes. It should be provided in the digital format agreed with the client before the work began.
Information is only useful when it can be located, understood and relied upon. Photographs without location references, product details or inspection records are unlikely to provide an adequate long-term audit trail.
Ask who checks the work, when inspections take place and what happens if an installation does not match the proposed detail.
A professional quality process should include:
Fire stopping works are frequently undertaken in hospitals, care environments, schools, residential blocks, universities, offices and other occupied buildings.
The contractor should explain how it will:

Fire stopping does not operate in isolation. It must integrate with compartment walls, floors, fire doors, cavity barriers, fire and smoke dampers, fire curtains and the building's overall fire strategy.
A contractor with broader passive fire protection knowledge is better placed to identify interfaces, coordinate remedial work and avoid resolving one defect while leaving another unaddressed.
Relevant experience is particularly important in heritage properties, healthcare environments, residential buildings and sites that must remain operational throughout the project.
Ask for examples demonstrating:

Compartmentation can be compromised after project handover by maintenance, refurbishment, new cabling, pipework or alterations to building services.
Ongoing support may include:
FireRite Consultancy Services
FireRite provides fire compartmentation surveys, passive fire protection, fire stopping remediation, fire strategies, fire-risk compliance support and fire safety training.
Our priority is to provide clear and practical advice. This includes explaining where an installation can be certified, where further technical evidence may be required and where an improvement must be transparently documented as a betterment.
We work across commercial, healthcare, education, residential, public sector, heritage and industrial environments, providing solutions that support life safety, asset protection and continuing compliance.
FireRite Consultancy Services
Talk to FireRite
Tell us about the building, the concern and any reports, drawings or fire safety information already available. We will help you establish the most appropriate next step.
Telephone: 029 2086 7222
Email: sales@firerite.co.uk
Address: Unit 14, Roundabout Court, Bedwas House Industrial Estate, Caerphilly, CF83 8FS
Protecting buildings. Preserving assets. Prioritising life safety.